POptions Project (multi-stage)
Each construction stage has its own options and one TGS. The CTMP report combines all stages; generate the TGS sheet for the active stage only.
| # | Stage | TGS | Options | Updated | Status |
|---|
Review selected pool parameters, then generate CTMP report and TGS sheet from one page.
No project context setFollow these steps to build CTMP option analysis and stage TGS sheets.
Click Open Options Pool. Browse categories, select treatments, set Yes/No, then export back to this report.
In Options Project, save the stage, set its TGS reference, and add more stages if the CTMP has multiple work packages.
In Step 1, edit status and project reasoning. Click Save Edits before switching stages so changes are kept.
Step 2 builds one combined Options Analysis report covering every saved stage in the project.
Step 3 builds the A3 sheet for the active stage only. Edit cells on the sheet if needed, then print or export an image.
Export Project JSON for backup, switch stages to repeat Steps 1–5, or send the analysis into the CTMP workflow when ready.
Each construction stage has its own options and one TGS. The CTMP report combines all stages; generate the TGS sheet for the active stage only.
| # | Stage | TGS | Options | Updated | Status |
|---|
Loaded from Options Pool selection or imported JSON. Use the red × on the left of any row to delete that option (same as Risk Assessment).
Builds one combined CTMP report covering every saved construction stage in the project.
Builds A3 landscape sheet(s) for the active stage only. Target is one readable page; if needed, a second page is used (maximum 2 pages).
CTMP Submission Report — all construction stages combined